Issues
The costs we don't know are the costs of:
Obtaining zoning variances from three communities
Bringing Camp Meeting Rd to a condition that will support anticipated traffic
Keeping Camp Meeting from collapsing while construction is occurring
Permitting and mitigating wetland disturbances
Permitting and mitigating species of special concern
Blasting
Grievances from community regarding blasting
Future engineering
Grading after red bed studies affect grading slope plans
The risk that a landslide like that on Rt. 65 will occur as a result of blasting and grading and is it insurable?
Kilbuck landslide cost more than $80m to repair and no building was built there.